Independent reference. UK figures verified 21 June 2026. No vendor affiliation.
Compare

Knockdown rebuild vs renovation

A strip-back-to-brick renovation typically lands within 15% of new-build cost per sqm once rewire, replumb, retrofit insulation, structural openings, and conservation-grade compliance are tallied. KDR wins on lifetime energy cost and VAT, renovation wins on character and consent risk.

Oliver Wakefield-Smith · Updated 21 June 2026 · Reviewed against HMRC VAT Notice 708, BCIS Q2 2026, Homebuilding & Renovating

Renovation cost categories that close the gap

Rewire (£5k to £10k for a 4-bed). Full replumb plus boiler (£8k to £15k). Retrofit cavity-fill, EWI or IWI, plus roof insulation (£15k to £35k). Structural openings for open-plan ground floor (£8k to £18k each). Replacement glazing with thermal bridge detailing (£15k to £30k). Add it up and a 200 sqm reno regularly clears £400k before fit-out.

VAT treatment

Renovation is standard-rated at 20% in general[HMRC 708]. 5% reduced rate applies to qualifying empty homes (typically vacant 2+ years) and to changes-in-number-of-dwellings; KDR is zero-rated. Most owner-occupied renovations pay 20%.

When renovation is forced

Listed buildings, conservation areas, strong local-plan policy protecting interwar housing stock, and any mortgage that cannot be vacated for the build period. Otherwise the math leans KDR above 130 sqm of new floor area.

Primary sources

Next decisions